First samples submitted for assay from 10,000m drill program
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
ASX:BAK
27 July 2026
13–15 Rheola Street
West Perth WA 6005
+61 8 9386 0855
www.barklyrareearths.com
FIRST SAMPLES FROM 10,000 m RESOURCE
EXPANSION CAMPAIGN AT LABORATORY
Barkly Rare Earths Limited (ASX:BAK) (‘Barkly’ or the ‘Company’) has submitted the first sample
batch to the laboratory from its 10,000 m Phase 1 resource drilling programme at the flagship
Barkly Project. The programme targets shallow mineralisation around the existing 40 Mt @ 2,100
ppm TREO Inferred Mineral Resource1
, where mineralisation remains open in all directions.
Highlights
First sample batch from 10,000 m drilling programme delivered to ALS
Geochemistry in Brisbane for analysis
Programme targets shallow mineralisation around the existing 40 Mt @
2,100 ppm TREO Inferred Mineral Resource1
Technical team continues to optimise drilling procedures for ground
conditions
Figure 1: Barkly’s Managing Director, Craig Wright, meets with ALS Geochemistry sample preparation
manager, Shannon Holdsworth (left), and inspects laboratory sample preparation equipment (right).
1
Refer to Previous Disclosure section for reference.
ASX ANNOUNCEMENT
FIRSTSAMPLESATLABORATORY
www.barklyrareearths.com 2
“It was great to see the first samples from our 10,000 m drilling programme
delivered to ALS for analysis. This is where the campaign moves from metres
drilled to assay results, and we expect further sample batches to follow as drilling
continues. The objective is clear: test the shallow mineralisation around our
existing 40 Mt Inferred Resource and generate the data intended to support a
resource update later this year.”
Craig Wright — Managing Director
BARKLY DRILLING PROGRAMME UPDATE
The first sample batch from the 10,000 m Phase 1 resource drilling programme at the Company’s
Barkly Project was submitted to ALS Geochemistry in Brisbane last week (Figure 1), an ISO/IEC
17025-accredited laboratory. The samples will be pulverised and prepared by lithium borate flux
fusion prior to acid dissolution and multi-element analysis via inductively coupled plasma mass
spectrometry (ICP-MS) and inductively coupled plasma atomic emission spectroscopy (ICP-
AES).
The early stage of the programme is focused on establishing sample quality, optimising drilling
efficiency, and positioning the team for optimal performance across the campaign. The drilling
programme targets expansion of the existing 40 Mt Inferred Mineral Resource, which grades
2,100 ppm Total Rare Earth Oxide (TREO) for 82,000 tonnes of contained TREO (refer to Previous
Disclosure section). The resource is reported in accordance with the JORC Code (2012) above a
430 ppm NdPr cut-off grade.
Figure 2: Map of the area where initial drilling is being undertaken relative to the Immediate Zone
(purple), and the existing Inferred Mineral Resource (red).
ASX ANNOUNCEMENT
FIRSTSAMPLESATLABORATORY
www.barklyrareearths.com 3
The majority of the programme’s ~400 shallow holes, averaging ~25 m deep, are planned within
the Immediate Zone, illustrated in purple in Figure 2, above.
EXPLORATION NEXT STEPS
Ongoing Exploration Results from 10,000 m of drilling (Q3 & Q4 CY2026)
Rare earths concentration and extraction testing (ongoing)
Mineral Resource update (Q4 CY2026, subject to drilling and lab assay progress)
Geo-metallurgical test work and modelling (Q3 & Q4 CY2026)
Buntine exploration results (Q3 CY2026)
Follow-up exploration at Buntine (Q4 CY2026)
This announcement has been authorised for release by the Board of Barkly Rare Earths Limited.
ENDS
Enquiries
Barkly Rare Earths Investor Relations
+61 8 9386 0855
ir@barklyrareearths.com
About Barkly Rare Earths Limited:
Barkly Rare Earths Limited (ASX:BAK) is an Australian mineral exploration company focussed on the
discovery and development of economic mineral deposits, driven by technical expertise and disciplined
execution. Its strategy is to discover, delineate, and develop deposits capable of supporting long-term
production to meet growing global demand.
The Company’s flagship Barkly Project in Australia’s Northern Territory spans 5,030 km2
and is held 100%
by Barkly Rare Earths. It has an initial Inferred Mineral Resource of 40 Mt @ 710 ppm Magnet Rare Earth
Oxide (MREO), within 2,100 ppm Total Rare Earth Oxide (TREO) (reported above a 430 ppm NdPr cut-off
grade). The Mineral Resource includes a high terbium component, with low uranium and thorium. Initial
conventional leaching tests achieved 74% MREO extraction, with initial beneficiation test work returning a
mineral concentrate of 29,000 ppm TREO. The consistently high MREO grade and continuity of
mineralisation present an opportunity to build a project of global significance.
At the Company’s Buntine Project in the Northern Territory, the Fraynes Formation is
chronostratigraphically equivalent to the Barney Creek Formation that hosts the McArthur River Pb-Zn
deposit, making the Fraynes Formation a target for greenfields base metal exploration. Polymetallic
mineralisation is exposed at the Buntine Project along a nine-kilometre (9 km) strike length of late-
Paleoproterozoic sedimentary rocks and overlying Cenozoic sediments, with three different anomalous
zones of Pb-Co, U-W-Pb-Ni, and Zn-Pb-Co-Cu along the mineralised corridor. Rock chip samples grade up
to 667 ppm Zn, 1% Pb, 1,760 ppm Co, 316 ppm Cu, 10% Mn, 7,100 ppm Ni, and 239 ppm Cr.
For more information, please visit: https://barklyrareearths.com/link/r8nMGy.
ASX ANNOUNCEMENT
FIRSTSAMPLESATLABORATORY
www.barklyrareearths.com 4
Forward-Looking Statements
This announcement includes various ‘forward-looking statements’ with respect to, among other things,
goals, plans, and strategies. Such forward-looking statements are not guarantees of future performance
and involve known and unknown risks, uncertainties and other factors beyond the control of the Company
that may cause the actual results, performance and outcomes to be materially different from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide
only and should not be relied on as an indication or guarantee of future performance. Given these
uncertainties, recipients are cautioned not to place undue reliance on any forward-looking statement.
Subject to any continuing obligations under applicable law, the Company disclaims any obligation or
undertaking to disseminate any updates or revisions to any forward-looking statements in this
announcement to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based.
Previous Disclosure
The information in this announcement that relates to Exploration Results and Mineral Resources is
extracted from the previous report titled Barkly and Buntine Projects, Northern Territory, Australia,
Independent Technical Report, included as Annexure A to the Company’s Prospectus dated 1 December
2025. The previous report was prepared in accordance with the 2012 Edition of the JORC Code, and it is
available to view at the Company’s website www.barklyrareearths.com. The Company confirms that it is
not aware of any new information or data, as at the date of this announcement, that materially affects the
information included in the original market announcement and, in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Person’s (Paul Teniere) findings are presented
have not been materially modified from the original market announcement.
Glossary
TREO (Total Rare Earth Oxide)
La2O3+CeO2+Pr6O11+Nd2O3+Sm2O3+Eu2O3+Gd2O3+Tb4O7+Dy2O3+Ho2O3+Er2O3+Tm2O3+Yb2O3+Lu2O3+Y2O3
NdPr (Neodymium-Praseodymium mixed oxide)
Nd2O3+Pr6O11
MREO (Magnet Rare Earth Oxide)
Nd2O3+Pr6O11+Tb4O7+Dy2O3
MREO Ratio (%)
MREO/TREO x 100
Share your feedback
Discover