QUARTERLY ACTIVITIES REPORT
September 2026
Barkly Rare Earths Limited (ASX:BAK) (‘Barkly’ or the ‘Company’) is pleased to provide its
quarterly activities report for the quarter ended 30 September 2026 (the ‘Quarter’), during which
the Company began drilling its Phase 1 resource drilling programme at the Barkly Project and
reported the first Phase 1 assay results.
Highlights
Barkly Project
• The Phase 1 drilling programme began in July 2026, with 71 holes drilled for 1,668 m in
the Quarter. After an extended period of downtime awaiting replacement parts, drilling
recommenced on 5 October 2026.
• The first assay results, reported on 16 September 2026, returned significant rare earth
intercepts from all 28 holes assayed, up to 23 km apart. Significant intercepts have since
been reported from 56 of 60 holes (to 19 October 2026).
• A single caustic conversion and acid leach sighter test extracted 99% of magnet rare
earth oxide (MREO) to the acid leach solution on a calculated-head basis. The result is
from one small composite and needs repeat and confirmatory testwork.
• A third Environmental Mining Licence was granted on 23 July 2026.
Buntine Project
• Rock-chip sampling was completed in July 2026. Assay results are expected in Q4
CY2026.
Corporate
• Cash of A$3.45 million at 30 September 2026, after exploration expenditure of
A$1.50 million in the Quarter.
• Annual Report lodged on 30 September 2026; Annual General Meeting scheduled for 27
November 2026.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 2
BARKLY PROJECT
Project Background
The Company’s flagship Barkly Project in the Northern Territory covers 5,030 km2
and is held
100% by the Company (Figure 1). Historical exploration on two of the prospects within the project
comprises 755 m of drilling in 46 shallow holes, averaging ~16 m in depth and covering under 1%
of the project area.
These drilling data were used to delineate an Inferred Mineral Resource of 40 Mt @ 2,100 ppm
Total Rare Earth Oxide (TREO), including 710 ppm MREO, for 82,000 tonnes of contained TREO
and 28,000 tonnes of contained MREO (a 34% MREO ratio), reported in accordance with the
JORC Code (2012) above a 430 ppm NdPr cut-off grade (see Previous Disclosure section). The
rare earth Inferred Mineral Resource is shallow, flat-lying and open in all directions laterally. It is
classified within two optimised pit shells (green area in Figure 2). In part, it is overlain by a
separate vanadium Inferred Mineral Resource of 200 Mt @ 0.12% V2O5 for 240,000 tonnes of
contained V2O5, reported above a 0.10% V2O5 cut-off grade and in accordance with the JORC
Code (2012) (see Previous Disclosure section).
DevEx Resources Limited (ASX:DEV) holds an earn-in right over the uranium rights on the Barkly
tenements, under which it can earn up to 75%. The Company retains 100% of the rights to all
non-uranium minerals, including rare earths and vanadium.
Figure 1: Location of the Barkly and Buntine Projects, Northern Territory.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 3
Exploration Target
The Company’s Exploration Target for the Barkly Project is reported as a range of potential tonnes
and grades in Table 1, and its area is illustrated in Figure 2. Exploration Targets are
approximations. The potential quantity and grade of the Exploration Target is conceptual in
nature.Therehasbeen insufficientexplorationtoestimatea MineralResourceforthe targetarea,
and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The
Exploration Target is reported in accordance with the JORC Code (2012).
Table 1: Barkly Project Rare Earths Exploration Target
Category Tonnage (Mt) TREO (ppm) NdPr (ppm)
Exploration Target 200–1,000 1,600–1,900 500–700
Figure 2: Drillhole location map illustrating the extent of the initial 40 Mt Inferred Mineral Resource
(green), the surrounding Exploration Target (purple), the maximum individual assay for each drillhole
reported to 19 October 2026, and completed/redrilled holes (grey) at or being prepared for the laboratory.
The Exploration Target represents potential extensions of mineralisation beyond the current
Inferred Mineral Resource. It is interpreted based on possible extensions of mineralisation in
mapped, laterally extensive, near-horizontal Cretaceous sandstones, and on laboratory results
from previously disclosed samples collected from 755 m of aircore drilling from 46 holes, and on
samples from the 60 RC drillholes reported to date at the Barkly Project. Drillhole spacing is
variable, with RC drill lines and holes mostly ~800 m apart, except where buffer zones required
under the Environmental Mining Licences prevent this. Spacing of the earlier aircore drilling
ranges from 150–300 m to ~1,000 m hole spacing (refer to Previous Disclosure section). The
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 4
Exploration Target relates to an area where the presence of a mineral deposit can be suggested
based on interpreted geological continuity, and on the presence of mineralisation in drillholes
across the Exploration Target area. The Company is testing the Exploration Target through the
Phase 1 drilling programme. The majority of the programme’s planned ~400 shallow holes,
averaging ~25 m deep, are within the Exploration Target area illustrated in Figure 2. Assays from
the drilling to date are being incorporated into the geological model ahead of the Q4 CY2026
Mineral Resource update, and the Exploration Target will be reviewed with that update.
Phase 1 Drilling Programme
The Phase 1 programme comprises shallow reverse circulation (RC) drilling across
approximately 400 holes, averaging ~25 m in depth, on a grid of approximately 800 m × 800 m. It
is designed to test for extensions of rare earth mineralisation across the Exploration Target and
more widely across the project area, to test for repetitive sequences of mineralisation, to build
geological knowledge, and to source samples for metallurgical testwork.
Following the mobilisation reported in the June 2026 quarterly report, civil contractors prepared
access tracks and drill pads, and drilling began in July 2026 with a multi-purpose rig contracted
from Colling Exploration, an Indigenous-owned company based in Pine Creek, Northern
Territory. The first samples were submitted to ALS Brisbane for assay in late July.
Figure 3: Barkly’s Managing Director, Craig Wright, and GM—Exploration, Richard Hall, discussing first
drillhole setup at the Barkly Project.
In the Quarter the Company drilled 71 holes for 1,668 m (Table 2). The rig was then out of service
for an extended period from September while replacement parts were machined and delivered
to site. Drilling recommenced on 5 October 2026 (see Post Quarter End). By 15 October 2026 the
Company had drilled 2,168 m, including redrills.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 5
Table 2: Phase 1 drilling summary
Period Holes Metres
Quarter ended 30 September 2026 71 1,668
5–15 October 2026 (post quarter end) 18 500
Total to 15 October 2026 89 2,168
Totals to 15 October 2026 are as reported in the ASX announcement dated 19 October 2026 and include six redrills.
Samples are geologically logged at the rig and screened with portable XRF (pXRF) to select
intervals for laboratory submission. The Company relies on laboratory assays to determine rare
earth grades. Samples are assayed at ALS Brisbane, an ISO/IEC 17025-accredited laboratory, by
lithium borate fusion with ICP-MS finish (ME-MS81).
First Phase 1 Assay Results
The Company released the first Phase 1 assay results on 16 September 2026. Significant rare
earth intercepts were returned from all 28 holes assayed, in drillholes up to 23 km apart and from
as shallow as 9 m downhole. MREO represented 31–40% of TREO in 27 of the 28 intercepts,
consistent with the 34% MREO ratio of the existing Inferred Mineral Resource, and uranium and
thorium were consistently low.
The intercepts reported on 16 September 2026 were from pXRF-screened intervals. Follow-up
assays on samples taken above and below those intervals were reported on 6 October 2026 and
widened 11 of the 28 intercepts. On 19 October 2026 the Company restated the grades of all
intercepts using four-decimal metal-to-oxide conversion factors. The restatement lowered TREO
grades by less than 0.2% and MREO grades and the individual oxides by less than 0.4%, and did
not change any intercept intervals.
Table 3: Phase 1 assay results reported to date
Announcement
Holes reported
(cumulative)
Holes with
significant
intercepts
(cumulative)
Comment
16 September 2026 28 28 First Phase 1 assays, from pXRF-
screened intervals
6 October 2026 (post
quarter end)
44 43 A further 16 holes (15 with significant
intercepts); follow-up assays widened
11 intercepts
19 October 2026 (post
quarter end)
60 56 A further 16 holes (13 with significant
intercepts), including the first eight
northwest holes (five with significant
intercepts)
Across the 60 holes reported to 19 October 2026, 58 significant intercepts in 56 holes total
118.5 m with an average width of 2.0 m. MREO represents 29–39% of TREO in 55 of the 58
intercepts. Table 4 lists selected intercepts at the restated grades. Significant intercepts are
reported above a lower cut-off of either ≥500 ppm TREO over ≥1.0 m downhole, or ≥100 ppm Y2O3
in a single assay, with a maximum of 1 m internal dilution. All intercepts, drillhole collar locations
and the JORC Code Table 1 are in the ASX announcement dated 19 October 2026.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 6
Table 4: Selected Phase 1 intercepts
Hole From–To (m) Width (m) TREO (ppm) MREO (ppm)
Highest single assay: TREO
/ MREO (ppm), interval (m)
BAK0138 10.0–11.5 1.5 3,118 1,002 4,759 / 1,278 (10.0–10.5)
BAK0289 9.5–11.0 1.5 2,973 1,086 5,971 / 2,342 (10.0–10.5)
BAK0133 11.0–13.0 2.0 2,713 948 6,057 / 2,266 (11.5–12.0)
BAK0080 14.5–16.5 2.0 2,581 929 5,163 / 2,048 (15.5–16.0)
BAK0295 20.5–23.0 2.5 1,774 614 2,599 / 845 (21.0–21.5)
BAK0284 22.0–27.5 5.5 1,035 343 1,721 / 502 (23.0–23.5)
BAK0284 is the widest Phase 1 intercept reported to date. BAK0133 and BAK0080 were the highlighted intercepts in
the 16 September 2026 announcement (BAK0133: 2 m @ 2,716 ppm TREO (951 ppm MREO) from 11 m; BAK0080:
1.5 m @ 3,228 ppm TREO (1,195 ppm MREO) from 15 m). Table 4 shows their grades as restated on 19 October 2026.
Only BAK0080 was also widened (from 1.5 m to 2.0 m) by the follow-up assays described above.
Metallurgy
On 31 August 2026 the Company reported that a single caustic conversion and hydrochloric acid
(HCl) leach sighter test, completed independently by Nagrom on a composite sample from the
Barkly Project, extracted 99% of MREO to the acid leach solution on a calculated-head, product-
stream basis. A total of 94% of yttrium reported to the acid leach solution, and 92% of
phosphorus reported to the caustic conversion solution with no measurable rare earths in that
stream. Previous leach testwork, using sodium hydroxide treatment followed by HCl leaching,
extracted up to 74% of MREO. The operating conditions differed, so the comparison is indicative
only.
The result is from a single sighter test on a small, non-representative composite, with no
duplicate test of this route. The calculated head grades reconciled to approximately 87% (MREO)
and 84% (Y2O3) of the direct assay head, and downstream purification, impurity removal and rare
earth product recovery have not been demonstrated. Further samples are being collected during
the current campaign to provide additional material for ongoing test work and to optimise
conditions.
The Company appointed Lu Zhang of MinPro Consult Pty Ltd as an independent metallurgical
consultant to oversee the design, management and reporting of metallurgical testwork for the
Barkly Project. Ms Zhang will provide independent technical review and oversight of the
Company’s metallurgical testwork programme, including coordination with specialist
laboratories and review of metallurgical results before public reporting. Her appointment
strengthens the Company’s independent technical governance as Barkly advances further
optimisation, comparative leach testwork and flowsheet development at the Barkly Project.
Tenure and Environmental Approvals
A third Environmental Mining Licence (EML) at the Barkly Project was granted by the Northern
Territory Department of Lands, Planning and Environment on 23 July 2026. It complements the
two EMLs granted in the June 2026 quarter and the Deemed Mining Licence (DML) already held
by the Company. The tenements held at 30 September 2026 are listed in the Mineral Tenement
Holdings table at the end of this report and remain in good standing.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 7
Post Quarter End
Due to extended drill rig downtime, the Company is tendering for a second drill rig to increase
drilling rates and will update the expected timing of programme completion as drilling
progresses.
On 6 October 2026 the Company reported assay results for a further 16 holes, 15 with significant
intercepts, taking the total to 43 of 44 holes reported. Forty-nine follow-up assays from 16 of the
first 28 holes widened 11 intercepts, and the 28 intercepts first reported on 16 September 2026
now average 2.1 m in width (previously 1.7 m). The widened intercepts carry lower average
grades than the pXRF-screened intervals first reported.
On 19 October 2026 the Company reported assay results for a further 16 holes, 13 with
significant intercepts, taking the total to 56 of 60 holes reported, in drillholes up to 23 km apart.
All eight southern holes, in and around the southwestern part of the existing Inferred Mineral
Resource, returned significant intercepts, with assays up to 4,550 ppm TREO. Five of the first
eight northwest holes, 6–8 km from previously reported intercepts, also returned significant
intercepts, including the widest Phase 1 intercept to date (BAK0284: 5.5 m @ 1,035 ppm TREO
(343 ppm MREO) from 22 m). Samples from 26 holes, two of which are redrills of assayed holes,
are at or being prepared for the laboratory, with results expected through Q4 CY2026.
Next Steps
• Assay results from the drilling programme (ongoing)
• Rare earths concentration and extraction testwork (ongoing)
• Mineral Resource update (Q4 CY2026, subject to drilling and laboratory assay progress)
• Geometallurgical testwork and modelling (Q4 CY2026)
• Buntine exploration results (Q4 CY2026)
• Follow-up exploration at Buntine (Q4 CY2026)
BUNTINE PROJECT
Project Background
The Company previously identified three different anomalous zones of Pb-Co, U-W-Pb-Ni, and
Zn-Pb-Co-Cu along the mineralised corridor at the Buntine Project, with various historical rock
chip samples grading up to 667 ppm Zn, 1% Pb, 1,760 ppm Co, 316 ppm Cu, 10% Mn, 7,100 ppm
Ni, and 239 ppm Cr (see Previous Disclosure section).
Field Work
The Company brought forward exploration at its Buntine Base Metals Project, originally planned
for Q4 CY2026, with reconnaissance mapping and rock-chip sampling in June and July 2026. The
programme aimed to further assess the prospectivity for polymetallic mineralisation within the
outcropping Blue Hole and Campbell Springs formations. The Company expects to report the
assay results in Q4 CY2026.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 8
CORPORATE
Promotion
During the Quarter the Company presented at the Northern Territory Investment Summit in July,
at Mines and Money Online Connect and at Mining the Territory on 3 September 2026. It took part
in a Paydirt interview on 8 September and in the Stockhead Explorers Podcast on 29 September,
and gave radio interviews.
Securities
On 6 July 2026 the Company issued 6,000,000 unquoted options, exercisable at A$0.30 and
expiring 28 January 2029, as consideration for capital markets advisory services provided by
Leeuwin Wealth Pty Ltd under an 18-month engagement (see the ASX announcements of 6 and
7 July 2026). The Company applied for quotation of the options. The Company has 81,250,000
fully paid ordinary shares (57,021,021 quoted and 24,228,979 restricted), 65,054,127 options
(52,445,463 quoted and 12,608,664 restricted) and 8,125,000 restricted performance rights on
issue.
Annual Report
The Company lodged its Annual Report, Appendix 4G and Corporate Governance Statement for
the year ended 30 June 2026 with the ASX on 30 September 2026 and will hold its AGM on Friday
27 November.
Cash and Related Party Payments
At 30 September 2026, the Company held cash of A$3.45 million.
During the Quarter the Company made payments to related parties of A$730,752, comprising
non-executive directors’ fees & superannuation (A$28,000), salary & superannuation payments
to executive directors (A$186,200) and consulting fees paid to RSC Global Pty Ltd for resource
programme management services (A$516,552). RSC is an associate of director René Sterk.
DISCLOSURE REQUIRED UNDER LISTING RULE 5.3.4
The Company was admitted to the Official List of the Australian Securities Exchange on 28
January 2026, having completed an initial public offering pursuant to a Prospectus dated 1
December 2025 and Supplementary Prospectus dated 8 January 2026. The Quarter ended 30
September 2026 is covered by the Use of Funds statement contained in the Prospectus, and the
Company provides the following information in compliance with Listing Rule 5.3.4.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 9
Table 5: Use of funds against the Prospectus
Use of funds item Prospectus A$
Quarter ended
30 September
2026 A$
Cumulative amount
spent from listing to end
of quarter A$
Variance* A$
Exploration at Barkly & Buntine
Projects
5,251,530 1,497,510 2,944,406 (2,307,124) ^
Environmental baseline
development studies
25,000 0 0 (25,000)
Community engagement 50,000 0 5,426 (44,574)
Related party loans and
settlements
203,026 0 205,631 2,605
Expenses of the public offer 1,127,050 0 821,200 (305,850)
Corporate and administration
costs
1,093,393 145,844 547,529 (545,864) #
Working capital 688,911 327,741 461,311 (227,600)
Total 8,438,910 1,971,095 4,985,503 (3,453,407)
* Material differences (>5% of forecast Use of Funds, being A$421,946) are explained as follows:
^ The period between admission to the Official List of the ASX and the end of the Quarter was 245 days, whereas the
Use of Funds statement forecasts exploration expenditure over the subsequent 24-month period. Drilling of the
Phase 1 programme began in July 2026 after wet-season delays and was interrupted in September while the drill rig
awaited replacement parts.
# The period between admission to the Official List of the ASX and the end of the Quarter was 245 days, whereas the
Use of Funds statement forecasts expenditure for the subsequent 24-month period. Accordingly, expenditure to date
is lower than the forecast for the full period.
MINERAL TENEMENT HOLDINGS
Mining tenements held at 30 September 2026, and tenements acquired during the Quarter
(Listing Rule 5.3.3). All tenements are in the Northern Territory.
Table 6: Mining tenements
Project Tenement Registered holder Status Interest
Nature of
change
Barkly Project1 EL32452 Barkly Rare Earths Limited Granted 100% -
EL32453 Barkly Rare Earths Limited Granted 100% -
EL32454 Barkly Rare Earths Limited Granted 100% -
EL32455 Barkly Rare Earths Limited Granted 100% -
EL32456 Barkly Rare Earths Limited Granted 100% -
EL32473 Barkly Rare Earths Limited Granted 100% -
EL32474 Barkly Rare Earths Limited Granted 100% -
Buntine Project EL32529 Barkly Rare Earths Limited Granted 100% -
EL32530 Barkly Rare Earths Limited Granted 100% -
EL32531 Barkly Rare Earths Limited Granted 100% -
EL32532 Barkly Rare Earths Limited Granted 100% -
EL32534 Barkly Rare Earths Limited Granted 100% -
EL32535 Barkly Rare Earths Limited Granted 100% -
EL33086 Barkly Rare Earths Limited Granted 100% -
EL33087 Barkly Rare Earths Limited Granted 100% -
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 10
Project Tenement Registered holder Status Interest
Nature of
change
EL33162 Barkly Rare Earths Limited Granted 100% -
1
DevEx Resources Limited (ASX:DEV) may earn 75% of the uranium rights on the Barkly tenements. The Company
retains 100% of the rights to all non-uranium minerals.
This announcement has been authorised for release by the Board of Barkly Rare Earths Limited.
ENDS
Enquiries
Barkly Rare Earths Investor Relations
+61 8 9386 0855
ir@barklyrareearths.com
About Barkly Rare Earths Limited
Barkly Rare Earths Limited (ASX:BAK) is an Australian mineral exploration company focussed on the
discovery and development of economic mineral deposits, driven by technical expertise and disciplined
execution. Its strategy is to discover, delineate, and develop deposits capable of supporting long-term
production to meet growing global demand.
The Company’s flagship Barkly Project in Australia’s Northern Territory spans 5,030 km2
and is held 100%
by Barkly Rare Earths. It has an initial Inferred Mineral Resource of 40 Mt @ 710 ppm Magnet Rare Earth
Oxide (MREO), within 2,100 ppm Total Rare Earth Oxide (TREO) (reported above a 430 ppm NdPr cut-off
grade). The Mineral Resource includes a high terbium component, with low uranium and thorium (7 ppm
Tb4O7, 3 ppm U, 7 ppm Th; see Previous Disclosure section). A caustic conversion and acid leach sighter
test resulted in 99% of MREO reporting to the acid leach solution on a calculated-head, product-stream
basis, and 94% of yttrium reporting to those streams. The combination of shallow, flat-lying mineralisation,
a consistently high magnet rare earth ratio and low uranium and thorium provides the basis on which the
Company is testing whether the Barkly Project can support long-term production at scale.
At the Company’s Buntine Project in the Northern Territory, the Fraynes Formation is
chronostratigraphically equivalent to the Barney Creek Formation that hosts the McArthur River Pb-Zn
deposit. The two formations are likely linked in the subsurface, making the Fraynes Formation a target for
greenfields base metal exploration. Polymetallic mineralisation is exposed at the Buntine Project along a
9 km strike length of late-Paleoproterozoic sedimentary rocks and overlying Cenozoic sediments, with
three different anomalous zones of Pb-Co, U-W-Pb-Ni, and Zn-Pb-Co-Cu along the mineralised corridor.
Rock chip samples grade up to 667 ppm Zn, 1% Pb, 1,760 ppm Co, 316 ppm Cu, 10% Mn, 7,100 ppm Ni,
and 239 ppm Cr (see Previous Disclosure section).
For more information, please visit www.barklyrareearths.com.
Competent Person’s Statement
The information in this announcement that relates to the Exploration Target is based on, and fairly
represents, information and supporting documentation prepared by Richard Hall, who is a Fellow of the
Australasian Institute of Mining and Metallurgy (FAusIMM), and a Member of the Geological Society of
Australia. He has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 11
Reserves’ (JORC Code, 2012). He consents to the inclusion in this announcement of the matters based on
his information in the form and context in which it appears.
Mr Hall serves as General Manager—Exploration of Barkly Rare Earths Limited as a full-time employee of
the Company, in which he has a shareholding. This association may give rise to a perceived conflict of
interest in relation to his role as Competent Person.
Forward-Looking Statements
This announcement includes various ‘forward-looking statements’ with respect to, among other things,
goals, plans, and strategies. Such forward-looking statements are not guarantees of future performance
and involve known and unknown risks, uncertainties and other factors beyond the control of the Company
that may cause the actual results, performance and outcomes to be materially different from those
expressed or implied by such statements. Forward-looking statements are provided as a general guide
only and should not be relied on as an indication or guarantee of future performance. Given these
uncertainties, recipients are cautioned not to place undue reliance on any forward-looking statement.
Subject to any continuing obligations under applicable law, the Company disclaims any obligation or
undertaking to disseminate any updates or revisions to any forward-looking statements in this
announcement to reflect any change in expectations in relation to any forward-looking statements or any
change in events, conditions or circumstances on which any such statement is based.
Previous Disclosure
The information in this announcement that relates to previous Exploration Targets, Exploration Results,
and Mineral Resources is extracted from the reports listed below, each prepared in accordance with the
2012 Edition of the JORC Code and available to view on the Company’s website at
www.barklyrareearths.com. The Company confirms that it is not aware of any new information or data as
at the date of this announcement that materially affects the information included in those reports, other
than the intercepts for 11 drillholes first reported on 16 September 2026, which were updated by follow-
up assays in the announcement dated 6 October 2026, and the grades of previously reported intercepts,
which were restated in the announcement dated 19 October 2026 using four-decimal metal-to-oxide
conversion factors, and, in the case of estimates of Mineral Resources, that all material assumptions and
technical parameters underpinning the estimates continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from those reports.
1. Barkly and Buntine Projects, Northern Territory, Australia, Independent Technical Report,
included as Annexure A to the Company’s Prospectus dated 1 December 2025. Competent
Person: Paul Teniere.
2. ASX announcement dated 31 August 2026 titled ‘99% Extraction of MREO’. Competent Persons:
Richard Hall and Lu Zhang.
3. ASX announcement dated 16 September 2026 titled ‘High-Grade Mineralisation in First Phase 1
Drill Results’. Competent Person: Richard Hall.
4. ASX announcement dated 6 October 2026 titled ‘Further High Grade Mineralisation in Phase 1
Drilling’. Competent Person: Richard Hall.
5. ASX announcement dated 19 October 2026 titled ‘Rare Earth Mineralisation Continues in a Further
16 Holes’. Competent Person: Richard Hall.
ASX ANNOUNCEMENT
QuarterlyActivitiesReportSeptember2026
www.barklyrareearths.com 12
Glossary
TREO (Total Rare Earth Oxide)
La2O3+CeO2+Pr6O11+Nd2O3+Sm2O3+Eu2O3+Gd2O3+Tb4O7+Dy2O3+Ho2O3+Er2O3+Tm2O3+Yb2O3+Lu2O3+Y2O3
NdPr (Neodymium-Praseodymium mixed oxide)
Nd2O3+Pr6O11
MREO (Magnet Rare Earth Oxide)
Nd2O3+Pr6O11+Tb4O7+Dy2O3
MREO Ratio (%)
MREO/TREO × 100
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
BARKLY RARE EARTHS LIMITED
ABN Quarter ended (“current quarter”)
86 641 565 139 SEPTEMBER 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1,497) (1,497)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (338) (338)
(e) administration and corporate costs (145) (145)
1.3 Dividends received (see note 3) - -
1.4 Interest received 27 27
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material) - -
1.9 Net cash from / (used in) operating
activities
(1,953) (1,953)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (18) (18)
(d) exploration & evaluation - -
(e) investments - -
(f) other non-current assets - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(18) (18)
3. Cash flows from financing activities
- 0
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- 0
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other (provide details if material) - -
3.10 Net cash from / (used in) financing
activities
0 0
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash e